The fin incorporates additional drought so it will be suitable for larger boats such as 10 Raters.
It can also be adapted for classes with restricted drought such as the IOM.
The lower Reynolds Numbers characteristic of IOM class boats makes it advantageous to use the top part of the fin mould, keeping the trunking design common.
These shots also courtesy Alex Kryger, Aptec Composites.
A good opportunity to share the thinking that led to the chosen layout.
Initially a dedicated RC tray moulding was designed with the aim of locating the mass of winch, batteries and servo as low in the boat as possible and close to the LCG to minimise pitching.
![]() |
| Discarded RC tray moulding design |
This solution had drawbacks that seem to be accepted in most existing designs but we thought we could eliminate:
– Dedicated un-reinforced openings in the deck would be required for access, sapping stiffness (or requiring reinforcement in the form of lips or additional laminate that would add weight only to restore the stiffness lost by cutting the openings in the first place).
– The openings would have to be very large if the tray were to be glued into the boat after hull and deck were moulded together.
Even if the size of the openings were minimised by separating them into the three functions (winch, batteries and servo), the tray would not fit through any of the holes.
An option was to create three separate trays. However, because each would have to be larger than the hardware it must accommodate, opening size could not be optimised.
Being unable to drop the tray in through the access openings would have closed the door to one-piece moulding of hull and deck as a unitary laminate.
The lateral solution was to suspend the RC gear in dedicated wells moulded into the deck.
An important design constraint imposed when exploring this solution was to maintain the same low centre of gravity for winch, battery and servo.
The radius into the wells actually adds stiffness to the deck, complementing the inherent rigidity of the chambered shape.
Separate patches over each opening facilitate access and improve watertight integrity.
Another choice that will enhance ease of access is the re positioning of the sheet fairlead to the foredeck.
This solution also simplifies the sheeting run and has secondary advantages such as the elimination of a sheeting post, reduced likelihood of entanglement with other boats, and more direct transmission of sheet forces into forestay tension.
The magic is being worked by Aptec Composites.
Images courtesy Alex Kryger.
Hull plug/pattern (above) and deck plug (below) machined ready for surface finishing.
Notice the bonding flanges for mast tubes and centreboard case, as well as all deck features, integrated in the tooling to ensure accuracy and repeatability.
The mould flanges and locating features to close the hull and deck mould together are also machined at this stage.
There is an interesting tradeoff between material cost and the expense of surface finishing.
In the case of larger simpler shapes we found it more economical to use an easy to machine stable but comparatively low cost material and go through the process of sealing and hand finishing to get the required surface finish.
Smaller and more detailed tooling will be machined from metal or plastic, requiring only a final polish after fine machining.
Where the parts must be made at high temperature, plastic plugs will be used to make female moulds in the same material as the eventual parts.
In the case of hull and deck, male patterns will be machined to replicate the finished outer surfaces. Composite moulds will then be taken from the patterns which also incorporate the mould mating flanges.
The finished moulds will be made such that they can be closed together to allow hull and deck to be cured giving a seamless product. The trick is a ‘slip joint’ where the deck laminate overlaps the hull, extending 12mm below the sheerline. An inflatable bladder made to exactly conform to the shape of the mould cavity applies pressure to the laminate during curing.
The deck incorporates recesses that form trays for the RC gear. The tooling is designed to allow them to be moulded as part of the deck. Alternatively the recesses can be left out of the deck, moulded separately and dropped in as required.
Locating features and bonding flanges for the new centreboard case and mast tube systems are also incorporated in the machined patterns to ensure accuracy.
Moulds for bulb, fin, rudder, transom and other small details are being machined directly from metal.
A perforated core will involve a weight penalty because the holes used to allow entrapped air to evacuate will end up filled with resin.
On the other hand, prepreg, though guaranteeing a known and consistent resin content, involves additional steps in de-bulking and the application of glue film layers.
Righting moment is therefore important if sail force is to be maintained.
Making the fin deeper increases bending moment for a given bulb weight. If this results in more fin deflection, it will reduce the gain in righting moment by allowing the bulb to move inboard more than it could if the fin flexed less.
Note that there is the option to keep righting moment constant by increasing draft and reducing bulb mass (smaller force, longer lever). But for now we are assuming that optimum displacement must be maintained.
It therefore cannot be called upon to follow steep curves, especially after it has already traveled some length along the surface and has therefore lost some energy. Unfortunately this is also the point where we want the flow to follow the section in toward the trailing edge.
Moving the bulb down (and away from the CG) may increase pitching moment, a potential drawback when sailing in waves.
The designer has to trade draught (good for righting moment) against fin bending losses, fin area, section thickness to chord ratio, Reynolds Number, aspect ratio and pitching moment.
Taking advantage of the improved section and construction, we increased draught for the same foil area and deflection.
The bulb was revised, incorporating the improvements in foil section (that translate to bulb thickness distribution) and adding a beaver tail as successfully used on our IOM designs.
![]() |
| Honeycomb core uses inherently strong shapes to keep the skins from moving relative to each-other. Image from http://www.rocketmaterials.org/ |
![]() |
| Resin fillets at the skin/core interface shown in blue. Getting these fillets right without filling the cells or starving some areas of resin is critical to the manufacturing process |
![]() |
| An exaggerated representation of foam core/skin bond showing surface cells filled with resin (again in blue) |
![]() |
| Katana in red, Octave in grey |
Armed with higher resolution tools, a more linear pressure recovery could be engineered reliably. The newly resolved pressure recovery rate is achieved through straighter diagonals from the mid section to the transom, combined with aft sections that are closer to semi-circular.
A very simplified overview might go something like this:
On the one hand we want to bring the flow back together (from max beam/draught to a point on the centreline/waterline near the transom) to
1) Make the wake as small as possible – smoothly refill the hole in the water made by the boat and
2) Get as much ‘push’ as we can from the water pressure on the aft surfaces of the boat – since the surfaces are angled inward, the normal pressure that acts at 90 degrees to the surfaces has a component pushing the boat forward. This component would in an ideal world be the same as that pushing back on the forward parts of the hull, but in reality is less due to energy lost through viscosity in the boundary layer.
On the other hand we want to maximise volume in the stern to
1) Get as much support as possible from the stern wave,
2) Damp pitching,
3) Avoid flow separation and
4) Maximise power.
All the while we want to keep wetted area to a minimum…
So you can see how nailing down more exact values makes our design choices much clearer!
In most conditions this particular change as implemented on Katana is near neutral. It trades the power and support of firm aft sections for reduced drag.
But in specific conditions (namely low to medium speeds, very high speeds, and in waves) our updated analyses show a small but measurable gain.
The new aft treatment has the advantage of less wetted surface area, which is a bonus at low speeds. At higher speeds the risk of laminar separation is reduced.
The forward volume distribution has been revised with a less aggressive rocker profile but more angular sections in the forefoot.
In fact the new stern treatment achieves a similar effect to the characteristic soft chine/tumblehome of Octave but does away with some associated minor penalties.
However, since the sections are more rounded, the actual distance along the hull surface between the two separation lines is only marginally greater than before.
To tip the scales, the principal advantage of the new stern shape is enhanced pitch damping. Marbleheads are inherently susceptible to speed sapping pitching due to their deep bulb, tall rigs, fine ends and (obviously) their small size relative to common wind generated waves.
Major values such as waterline beam, midsection area and prismatic coefficient have not changed.
Management of the flow has been refined whilst still achieving a 1.5% reduction in wetted surface area and an increase in power to carry sail, especially downwind.
There are several key tests that we apply to a new idea as it progresses from intuition, to vague notion, to sketch, to virtual model, to quantitative analysis, to prototype…
At each stage the value of the idea must stand up to tests which cover performance as well as reproducibility, cost, compatibility with existing items, durability, and especially the relationship between these key attributes.
In competitive performance applications, risk cannot be eliminated, but it should be estimated and managed.
There are always compromises to be made with respect to performance in different conditions and circumstances. We therefore make an effort to narrow the uncertainty so that we can inform the customer of the characteristics and suitability of each product.
Design work is going well with some very interesting insights already in the bag.
A promising hull concept has been identified and tests have started on a family of variants.The opportunity came up to run some more advanced simulations than we had originally hoped for.
This will add four weeks to the schedule but will give even greater confidence in the final design choices.
While the design work continues we have been evaluating options for tooling and construction methods as well as choosing suppliers for materials and parts.
The first choice regards which parts and stages to machine using CNC/CAM technology vs. traditional pattern/mould making and hand finishing.
This decision is about striking the right balance between machine time cost and labour cost.
Interestingly, the optimum strategy will differ depending on local labour rates, competitiveness in the CNC/CAM market, and the complexity of each part.
Early in the project we decided that investment in tooling is warranted where it will reduce the time required to assemble/finish each boat to the desired tolerances.
Though the exact shapes have not yet been finalised, it is safe to assume that the foil tooling will have a non planar geometry requiring high precision (fine tolerances) whilst being difficult to build using traditional methods owing to the lack of a flat reference plane.
Finally, it makes sense to include in the tooling certain details to optimise beam junctions, stay attachments, and fitting mounting features, again to reduce time spent hand finishing each boat.
With all the above considerations, and given availability of competitively priced CNC/CAM service providers in Australia, the numbers come out decidedly in favour of automated machining straight from the digital 3D model. This approach is consistent with our standard practice of fully modelling all assemblies before manufacturing.
Initially we looked at machining female tools out of solid material (alternatives included tooling board, modelling foam with machinable putty skins, or MDF with a glass skin).
This would eliminate the step of laying up female tools over traditional male ‘plugs’, but would have the drawback of constraining the temperature and pressure we could apply during the curing of the final parts.
Traditional composite female moulds laid up over computer machined male plugs seem like the way to go. They give the freedom to use prepregs at reasonable temperatures and pressures to obtain better compacted and more stable finished parts.
Integral in this decision-making process was an evaluation of different core materials that led to some interesting conclusions…
In the vertical plane the load is predominantly in ‘sagging’, with the forestay pulling up from part way along the cantilevered span, and the sidestay pulling up aft of the crossbeam. Mainsheet loads are passed to the back of each hull, adding to bending and introducing a shear/twist element.